Spend since last report: £230. Total hours labour since last report: 9.75
A fairly brief update for what happened in November and December. Following the broken leg, I started walking again in October and was not really able to get around properly until mid November. The pain and swelling from the ankle was not expected and continues, with the Consultant now saying this may well continue for at least a year. Great.
Being somewhat weak of ankle, in discomfort and rather fed up has meant that only minor jobs have happened. The exhaust manifold has been wrapped in heat bandage to reduce heat under the engine as it will vent out of the exhaust rather than radiating underneath. The brake pipe nuts that arrived just before the AGM were fitted to new pipe from the front splitter to the flexi hoses for each front wheel.

More seam sealer was added on joints to really try to keep the metal from rotting and as I was there, I added some insulation to the central hot air pipe which is easier when Eric is on his side. Bolts have been checked, the clutch cable bracket on the torsion tube was advised by an ex-air cooled mechanic to be a little flimsy, so that received a further 2mm steel plate to make it stronger.
The discolouration on the lower part of the photo is where brake fluid was coming out of the reservoir during my convalescence! Brake fluid is a great paint stripper, so that area has been cleaned down, neutralised, rust proofed, primed and painted. Again.
Spending this time is a set of Fuchs alloys with tyres from an ex-club member and a load of Just Kampers bits for pedals, grommets, brake light switch and other little bits. It soon adds up!
Maybe I can get in the garage soon and start bolting bits on, but in the meantime, I’m going to put my sore ankle up.